the Southern Gate Entrance at King Hussein International Airport

البوابة الجنوبية لمطار الملك الحسين الدولي

Project Image 1
Project Image 2
Project Image 3
  • Cost: 900,000 JOD
  • Client: Aqaba Development Corporation
  • Consultant: DAR AL OMRAN Planning. Architecture. Engineering
  • Location: Aqaba – Jordan
  • Status: Accomplished on schedule
  • القيمة الإجمالية: 900,000 دينار أردني
  • صاحب العمل: شركة تطوير العقبة
  • الاستشاري: شركة دار العمران للتخطيط والعمارة والهندسة
  • الموقع: العقبة - الأردن
  • حالة المشروع: تم الإنجاز حسب الجدول الزمني

Details

Scope: Rehabilitation and development of the southern gate entrance at King Hussein International Airport in Aqaba. It includes the construction of a main office building, a baggage screening building, entrance and exit canopies, and a security inspection building, with a total building area of 1,400 square meters. The project also covers civil, architectural, and electromechanical works, in addition to external works such as paving, parking lots, and asphalt roads, covering a total area of 13,800 square meters. Furthermore, it includes the rehabilitation of the existing airport gate.

وصف المشروع

إعادة تأهيل وتطوير مدخل البوابة الجنوبية لمطار الملك حسين الدولي في العقبة. يتضمن المشروع إنشاء مبنى مكاتب رئيسي، مبنى فحص الأمتعة بالأشعة، مظلات الدخول والخروج، ومبنى التفتيش الأمني، بمساحة إجمالية 1,400 متر مربع للمباني. يشمل المشروع الأعمال المدنية والمعمارية، والأعمال الكهربائية والميكانيكية، بالإضافة إلى الأعمال الخارجية من ساحات، مواقف سيارات، وطرق أسفلتية، بمساحة إجمالية 13,800 متر مربع للأعمال الخارجية. كما يشمل المشروع أيضاً إعادة تأهيل البوابة القائمة للمطار.